I showed some pictures of a design for a cupola the other week. Progress is being made. The glass is cut and the assembly started. This post gives some pictures of the first panels to be completed.
These panels have been soldered and are waiting to be cemented.
This panel, the first to be cemented, is the other side of the above panel on the left.
So progress is being made, and the installation date should be met.
No comments:
Post a Comment